• 400-meter running track to meet Class 4 certification requirements
• Press box
• Plumbing
• Electrical wiring
• Fencing
• Concrete work
Special considerations: The aged out 1960s stadium at Acadiana High School was in disrepair. Flooding severely damaged the field, and the new design addressed drainage needs for a long-term future.