Carencro High School

Lafayette, LA

Project Manager: Mark Driver

 

Project Details:

• Excavation for large drain pond
• Buried pipe to carry water to pond
• Replaced natural turf football field
• 400-meter running track to meet Class 4 certification requirements
• Press box
• Scoreboard
• Plumbing
• Electrical wiring
• Fencing
• Concrete work

 

Special considerations: The 1960s stadium at Carencro High School was in disrepair. Flooding severely damaged the field, and the new design addressed drainage needs for a long-term future.