• 400-meter running track to meet Class 4 certification requirements
• Press box
• Plumbing
• Electrical wiring
• Fencing
• Concrete work
Special considerations: The dated 1960s stadium at Ovey Comeaux High School was in disrepair. Flooding severely damaged the field, and our engineering and design team addressed drainage needs for a long-term future.